today i got an eggnog latte instead of a mocha.
the dumpster only had 2 big bags of alien garbage, so i kept loading what scraps i could find. chuck the electrician showed up around 10 and started making a plan for wiring the front third of the building. exploratory cutting, removing old outlets and switches, etc.
i cut out a run of old black gas pipe, pulled up some framing base plates, loaded all the scrap metal into the alley (gone in ten minutes), and tried to stay out of chuck's way.
around 3 i cut out for home. bathed, took seth into the yard, cut our mantel down a bit so it will be level when i reinstall it around the wood stove. doing dishes is pretty much my least favorite chore, but i did two batches, since they've managed to pile up in the last few days.
started trying to catch up with this blog and several days' worth of unanswered email.
ichatting with xan:
No comments: